Zum Inhalt springen
Filter Filter
Region
AT332 Innsbruck
|
ITD10 Bozen
Branche
Brenner Basistunnel (BBT)

Contract awarded to build Lot 1 of southern access to Brenner Base Tunnel - IRJ

[Presseaussendung, Newslink]
von AIM

RFI has awarded Webuild and Implenia a €1.07bn contract to design and build a 22km high-capacity railway between Fortezza and Ponte Gardena.

Externer Link